Codex Tasks: AB Test Research Designer → Commercial Product
Codex Tasks: AB Test Research Designer → Commercial Product
Section titled “Codex Tasks: AB Test Research Designer → Commercial Product”Based on
archive/2026-04-23-bcg-planning-docs/commercial-upgrade-plan.md
Generated: 2026-04-10
Total tasks: 18 | Estimated: ~9 weeks (1 dev)
Dependency order
Section titled “Dependency order”Phase 0 (Foundation) ──┬── Phase 1 (UX) ──┬── Phase 3.3 (Results)MUST RUN FIRST ├── Phase 2 (Visual) ├── Phase 3.4 (Shareable) └── Phase 3.1-3.2 ──────┘ │ └── Phase 4 (Advanced stats) │ └── Phase 5 (Polish)Phases 1 + 2 + 3.1 + 3.2 can run in parallel after Phase 0.
Task index
Section titled “Task index”| File | Task | Priority | Effort |
|---|---|---|---|
| phase-0-1-css-architecture.md | Design tokens + CSS Modules | Critical | 6h |
| phase-0-2-backend-modularization.md | Split main.py into APIRouter modules | Critical | 4h |
| phase-0-3-frontend-refactor.md | Refactor App.tsx + split experiment.ts | Critical | 5h |
| phase-1-1-onboarding.md | Empty state + sidebar tabs | High | 4h |
| phase-1-2-tooltips.md | Floating UI tooltips on all numeric fields | High | 3h |
| phase-1-3-live-calculations.md | Real-time preview + MDE/Power sliders | High | 5h |
| phase-1-4-ux-polish.md | Inline validation + toasts + keyboard shortcuts | High | 5h |
| phase-2-1-data-visualization.md | Power curve + sensitivity table (Recharts) | High | 6h |
| phase-2-2-visual-polish.md | Elevation + skeletons + micro-interactions | Medium | 4h |
| phase-2-3-icon-system.md | Replace inline SVGs with Lucide React | Medium | 2h |
| phase-3-1-multi-metric.md | Guardrail metrics (UI + backend) | High | 5h |
| phase-3-2-srm-detection.md | SRM checker (chi-square) | High | 4h |
| phase-3-3-results-tracker.md | Post-experiment results input + significance | Medium | 6h |
| phase-3-4-shareable-reports.md | Self-contained HTML export + print CSS | Medium | 4h |
| phase-4-1-sequential-testing.md | O’Brien-Fleming alpha spending | Medium | 6h |
| phase-4-2-cuped.md | CUPED variance reduction estimator | Medium | 4h |
| phase-4-3-bayesian.md | Bayesian power analysis mode | Low | 5h |
| phase-5-polish.md | A11y audit + i18n + Lighthouse CI | Medium | 6h |